Economic analysis
 
     
 
1. Project Cost
 
 
Item
Description
Q’ty
Cost
Remarks
1
GSE SP-25 SSWH
8
$16,000
$2,000 per unit.
2
Installation Materials
$0
Included.
3
Installation Labors  
$0
Included.
4
Project management  
$0
Included.
9
Total  
$16,000
 
 
     
  2. Economic Analysis  
 
Item Description Results Remarks
1
Project Cost
$16,000
 
2
Annual Savings
$4,400
One unit saves 1000 m³ gas per year on optimized performance conditions. Gas price $0.55/m³.
3
Investment pay-back cycle
3.6 years
4
Equipment life cycle analysis: Total static benefit throughout 25 year equipment design life cycle
$110,000
Gas price goes up every year. Your total benefit would be more than $110,000 in 25 year equipment life cycle.
5
Environment contribution
Yearly17.6 tonne green-house gases reduced each unit
440 tonnes GHG reduced in 25 year equipment life cycle.
 
     
     
 
  <<PREVIOUS   PHOTO ALBUM>>